Grand hôpital de Charleroi

During the construction of the new large hospital in Charleroi, 30,000 running meters of façade joints and 4,500 frames are finished with Detaflex 1500 and Parabond EPDM.

The site is managed by Franki sa/Jan de Nul, the facade joints are realized by S&S construction and the joints around the frames by Reflex façades sprl.